Edendale WWTP

Action Engineering was heavily involved with the mechanical design and installation at the Edendale WWTP upgrade.

With numerous connections into existing lines, the treatment capacity of the plant was increased by a third and a large storage pound was added for irrigation.

This included the supply and installation of all stainless steel pipe, both prefabricated off site and site run, all associated supports and bracketing, the installation of the dewatering and polymer systems and an intricate irrigation supply system.