Shotover Mechanical Pumps

Action undertook the majority of the mechanical works on the Shotover WWTP project. This included the design, fabrication and installation of Stainless steel pipework, walkways and platforms and pneumatic and wash water supply lines.
The team also completed the installation of the odour suppression system, sludge outfeed system and the grit removal system.